/home/techb158/trellopowerup.abdallabala.com/docs
NameSizeModeActions
00-design-study.md36780644editdlrm
01-uml-class-diagram.puml118690644editdlrm
02-use-case-diagram.puml37630644editdlrm
03-sequence-diagrams.puml97320644editdlrm
04-database-entity-model.mmd70510644editdlrm
05-database-schema.sql133720644editdlrm
06-diagram-preview.html50210644editdlrm
07-design-checklist.md32560644editdlrm
08-step-2-storage-layer.md53250644editdlrm
09-step-3-risk-crud-ui.md33800644editdlrm
10-step-4-mitigation-workflow.md39960644editdlrm
11-step-5-deployment-gate-workflow.md22920644editdlrm
12-step-6-multi-pm-integration.md37700644editdlrm
13-step-6-1-microsoft-planner-integration.md23350644editdlrm
14-step-7-reporting-export.md41580644editdlrm
15-step-7-1-oauth-live-connectors.md45450644editdlrm
16-step-8-user-roles-access-control.md32970644editdlrm
17-step-9-production-deployment-security.md42280644editdlrm
18-step-10-final-academic-submission.md31990644editdlrm
19-final-report-draft.md68140644editdlrm
20-instructor-submission-checklist.md36390644editdlrm
21-demo-script.md39480644editdlrm
22-traceability-matrix.md48470644editdlrm
23-testing-evidence.md29610644editdlrm
24-evaluation-rubric-mapping.md29100644editdlrm
25-final-deployment-runbook.md32140644editdlrm
26-known-limitations-and-future-work.md26320644editdlrm
27-final-qa-checklist.md28930644editdlrm
28-demo-rehearsal-script.md36180644editdlrm
29-submission-freeze-report.md27690644editdlrm
30-final-known-issues.md18760644editdlrm
31-trello-powerup-implementation-guide.md76080644editdlrm
32-vps-deployment-guide.md36970644editdlrm
dashboard-spec.md36910644editdlrm
methodology-mapping.md24710644editdlrm
next-implementation-step.md13040644editdlrm
trello-admin-setup.md21750644editdlrm
Edit: /home/techb158/trellopowerup.abdallabala.com/docs/methodology-mapping.md (2471B)
# COSMIC AI-Risk Methodology Mapping for Trello This mapping separates source-derived methodology concepts from software implementation logic. ## Source-derived concepts | Concept | Trello implementation | |---|---| | AI project risk is organizational, technical, and human | Risk item has a `dimension` field with organizational, technical, and human values. | | AI risks need quantitative indicators | Each card stores a normalized score from 0 to 100 plus residual score values. | | AI project management should account for project typology | Board or card assessment includes incremental, disruptive, applied research, AI-enabler, or citizen-led typology. | | Software/API prototype is a project objective | Power-Up frontend calls a REST API scoring service. | | Methodology phases include conceptual modeling, indicator design, API/engine implementation, validation | The prototype includes taxonomy endpoints, scoring engine, saved assessments, and board summary endpoints. | ## Software design extensions | Extension | Reason | |---|---| | Trello card badges for score and status | Makes risk visible without opening the card. | | Card back section for assessment details | Keeps risk governance close to the work item. | | Board dashboard | Provides a project-level view for governance meetings. | | Mitigation checklist creation | Converts mitigation planning into actionable Trello checklist items. | | Deployment gate logic | Operationalizes governance decisions using measurable conditions. | ## Trello object model | COSMIC artifact | Trello object | |---|---| | AI project | Board | | AI lifecycle phase | List or custom field | | Risk item | Card assessment record or linked risk card | | Mitigation action | Checklist item | | Evidence | Attachment or link | | Approval | Label, comment, or stored Power-Up data | | Governance gate | Card detail badge and dashboard status | ## Recommended board lists 1. Needs and Context 2. Data Preparation 3. Design 4. Model Development 5. Testing and Evaluation 6. Deployment and Monitoring 7. Risk Review 8. Approved for Gate ## Recommended labels | Label | Purpose | |---|---| | Risk: Low | Low residual risk | | Risk: Medium | Medium residual risk | | Risk: High | High residual risk | | Risk: Critical | Critical residual risk | | Gate: Blocked | Deployment cannot proceed | | Gate: Ready | Gate criteria are met | | Legal Review | Legal review required | | Ethical Review | Ethical review required |